Skip to lesson
Exit
Scheduling-Tetris Mastery1 / 2

2 min lesson

Sequence on purpose

Work through this case: "You're given a panel of five interviewers and a fly-in candidate's onsite day and asked to build the loop. Walk through how you'd sequence and structure it." Say what you would do and why.

Step 1 of 2

Sequence on purposeloop design

The order of interviews is a design decision, not whatever the calendar happens to allow. A candidate's energy and a panel's read both drift over a long day, so put your slots where they do the most good.

AN ONSITE DAY, SEQUENCED ON PURPOSE

Interactive diagram. Step through it with the Next and Previous controls below, or Tab to a region to read its detail.

diagram: loop-timeline

Step through the day in the order you'd build it - energy and the panel's read both drift, so slot placement is a design choice.