2 min lesson
Layer the controls across the lifecycle
Walk through "Layer the controls across the lifecycle" in order, then name the proof that tells you it worked.
Step 1 of 2
Layer the controls across the lifecyclein-flight validation, then PR-time, then manual
The PR-time pipeline above is the last gate, not the only one. A practitioner who builds this kind of review describes a layered architecture where each control sits at a different point in the dev lifecycle, so a bug has to get past several checks to ship.
Interactive diagram. Step through it with the Next and Previous controls below, or Tab to a region to read its detail.
diagram: flow
Hooks + rules validate while the agent works; manual bug-hunting runs in between; Bugbot is the last step at PR time. Each layer catches what the previous one missed.