1 min lesson
Bias to a working demo over perfection
Use the lesson to respond to this: "On the 2-day on-site project, you realize your original scope won't be demoable by the deadline. What do you do and why?" Keep the answer plain.
Step 1 of 2
A small, working, well-explained result beats an ambitious half-build every time in this format. Cursor values bias-to-ship: get something running on day one, then layer improvements. If you have to choose, choose the version you can actually demo and defend.
The round is partly a culture and collaboration test. Disappearing into your laptop for two days, even to produce something impressive, reads as exactly the solo-contractor energy the format is designed to screen out. Engage, eat with the team and let people see how you think.
Details vary: whether it's paid, whether it's exactly two days and what "present at the end" entails can differ by candidate and timing. Ask your recruiter about scope, expectations and logistics ahead of time so you walk in prepared rather than improvising the ground rules.