Skip to lesson
Exit
Capstone: Mock Loop & Self-Exam1 / 3

1 min lesson

Readiness scorecard & gaps

Put this idea into your own words: "Prep drifts toward what's comfortable unless a scorecard points it somewhere else."

Step 1 of 3

Prep drifts toward what's comfortable unless a scorecard points it somewhere else. Score each competency the loop tests, route every weak score to the module that fixes it, confirm your story bank is deep enough and build a one-week plan weighted to your lowest two scores.

Treat the rubric as a gap finder, not a score to admire. Mark the weakest proof, turn it into one practice rep and keep the artifact you would show an interviewer.

Learn more

Full explanation

What the Loop Weighs Hardest

WHAT THE LOOP WEIGHS HARDEST

Interactive diagram. Tab through its regions; each focused region shows its detail in the panel below.

diagram: signal-bars

The five competencies, ranked by how decisive they are across this loop. Your two lowest self-scores against the heaviest bars set the week.

Learn more

Advanced table

Score each competency against what the loop tests

Score each competency against what the loop testsBe honest - a 3 you can defend beats a hopeful 5

Competency
FinOps / COGS attribution
Your 1-5
__
Competency
GPU / capacity planning
Your 1-5
__
Competency
Program execution
Your 1-5
__
Competency
Systems literacy
Your 1-5
__
Competency
Values / why-Cursor
Your 1-5
__

Score before you study - your two lowest numbers set the week.

Map each weak score back to its fixEvery gap has a home in the track

If you scored low on…
FinOps / COGS
Re-drill cost attribution, showback vs. chargeback and why traditional cloud FinOps breaks on dynamic AI workloads; rebuild the take-home cost model
GPU / capacity
Re-drill reserved-vs-burst, the 60–80% sustained-use breakeven, utilization targets and tying GPU demand to DAU growth
Program execution
Re-drill scoping, critical pathThe longest end-to-end chain of dependent work in a plan; it sets the realistic timeline no matter how parallel everything else looks. A slip on the critical path moves the date; a slip on a task with slack does not. Press Enter for the full definition., RAIDRisks, Assumptions, Issues, Dependencies. A living program-tracking log: Risks (might go wrong), Assumptions (treated as true but unverified), Issues (a risk that already materialized), Dependencies (work blocked on someone else) — each with a single named owner. Press Enter for the full definition./risk registers, operating cadence and the influence-without-authority moves
Systems literacy
Re-drill inference-serving fundamentals - latency distributions, batching/throughput, model routing, what drives $/request
Values / why-Cursor
Rehearse the three debate prompts, the update-vs-hold drill and the 90-second why-Cursor with a peer poking holes